Radwin 5000 HPMP User Manual page 56

5000 series point to multipoint broadband wireless
Hide thumbs Also See for 5000 HPMP:
Table of Contents

Advertisement

Installing the Base Station
To install a LPU on a wall adjacent to an IDU (PoE or IDU‐H):
1. Use the supplied wall 
clamp to mount the 
second LPU as close 
as possible to the 
indoor access point 
to the IDU.
2. Ground the LPU to 
an earth strip using 
the grounding lug.
3. Remove the top 
cable LPU gland cap 
together with the 
rubber sealing tube.
4. Thread the IDU cable 
from the upper LPU, through the removed cap from the previous step.
5. Plug it in to the top of the LPU.
6. Screw down and tighten the LPU cap.
7. Connect the 0.5 m CAT‐5e cable to the Bottom of the LPU.
8. Connect the other end (via the indoor access point) to the IDU.
9. Insulate both LPU connections. See the next section, Additional Considerations for 
Waterproofing
Additional Considerations for Waterproofing
Lightning Protectors and Ethernet Repeaters
If these units are installed at locations heavily exposed to heavy dust, rain or corrosive 
moisture (for example, close to the sea), you should protect them further as in the following 
procedure. In the remainder of this section, "unit" refers to either a Lightning Protection Unit 
or a Repeater.
To seal a unit against excessive dust and moisture:
1. Obtain a high quality sealing material such as Scotch 23 Tape ¾" wide, from 3M to 
ensure IP‐67 compliant protection against water and dust.
2. Cut two pieces each 25 cm long, of Scotch 23 splicing tape. Remove the plastic cover 
to expose the tacky side of the sealing tape as shown in Figure
RADWIN 5000 HPMP User Manual
below.
Release  3.5.70
4‐29.
4‐22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents