Overview
Sector site planning consists of a set of surveys, which must be carried out before any 
equipment is deployed. If for some reason, the outcome of any of these surveys is negative, 
HBS or HSU re‐location will need to be considered.
A Site Survey consists of three stages:
1. Preliminary survey ‐ The proposed sector is analyzed in the office using a topographic 
map. You should use additional tools such as the Link Budget Calculator or the Radio Plan‐
ner.
2. Physical survey ‐ The locations of the indoor and outdoor equipment are determined on‐
site.
3. Radio Frequency (RF) survey ‐ It is recommended that the installation area be scanned 
with a spectrum analyzer, to identify RF interference so as to determine a clear channel for 
radio installation (on‐site).
The Site Survey
Introduction
RADWIN wireless links must be planned before installation. The designated installation sites 
must be appraised to determine that the wireless system is able to operate efficiently and 
provide connectivity without signal degradation.
RADWIN 5000 HPMP offers a wide operating frequency range. A free frequency channel must 
be determined within the operating range, for optimum performance.