Installing the Base Station
Figure 4‐29: Exposing the tacky side of the sealing tape
3. After connecting the short CAT‐5e IDU/ODU cable (provided in the box) from the
ODU to the unit, tighten the cable gland cap firmly and use the insulation tape
scotch 23 to fully cover both of the cable glands.
4. Connect the tape with tacky side up on the cable gland cap and the CAT‐5e cable.
Start at Start Point at the bottom of the cable gland as shown in Figure
at End Point of the CAT‐5e cable, 2.5cm after the end of the shrink tubing. Stretch
the tape and apply half‐overlapped to form gap‐free joint.
Figure 4‐30: Start and End points for protective‐taping the unit
5. Wrap two layers of any scotch vinyl plastic electrical type (e.g Scotch Super 88 Vinyl
Plastic Tape from 3M) to protect the joints as shown in Figure
bottom of the cable gland and the end of the CAT‐5e cable are covered with the
sealing splicing tape and with vinyl plastic tape.
RADWIN 5000 HPMP User Manual
Release 3.5.70
4‐30. Finish
4‐31. Ensure that the
4‐23