RF Planning for Dense Installations and Collocated Sites
•
If one or more collocated units are not RADWIN units, ensure that there is a physical
separation of at least three meters between a RADWIN unit and any other collocated
radio on the site.
•
Use the largest possible frequency gap between these units
•
Choose the best frequency channel (as clear as possible from interference). You may be
able to change the band used for the sector ‐ depending on HBS model and regulations.
•
Decreasing the Tx Power of a sector will reduce collocation interference
Use the Link Budget Calculator to determine the minimum Tx Power
required to maintain sector stability.
Note
RADWIN 5000 HPMP User Manual
Release 3.5.70
3‐5