Configuring Synchronization Lines - Siemens SIMATIC BATCH Operating Manual

Process control system pcs 7
Table of Contents

Advertisement

BATCH Recipe Editor
10.4 Creating recipes
10.4.5.16

Configuring synchronization lines

Three examples are offered below to show and explain the semantics and the handling of
synchronization lines.
Example 1
Synchronization line 0 runs over two RUPs, RUP_1 and RUP_2. If all ROPs before the
synchronization line are completed, here ROP_A and ROP_B, the following two ROPs, here
ROP_C and ROP_D are started.
556
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents