Siemens SIMATIC BATCH Operating Manual page 180

Process control system pcs 7
Table of Contents

Advertisement

Engineering
7.3 BATCH engineering
Validation
During configuration, a validation signals possible errors and warnings. The objects concerned
are marked immediately by a colored lightning symbol in the navigation area. If you click on a
faulty object, you can then display and print out the corresponding report in the log area. The
log provides information on errors and warnings in the configuration.
Image 7-2
Log
Access protection
Access protection for projects configured for PCS 7 engineering also affects the BATCH
configuration dialog. For functions that affect changes in basic engineering, you need to
authenticate yourself with SIMATIC Logon.
180
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents