Unit:
Equipment module:
Single control unit:
Batch allocations of the levels in the example:
Process cell:
Area:
Unit:
Equipment module:
Single control unit:
7.1.3.11
Relationship between plant hierarchy, blocks and recipes
Introduction
For recipe creation and processing, the process cell and unit levels must exist at least once.
Whether or not you require the equipment module level depends on how you define the
equipment procedural elements.
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA
In the Reactor area: R501, R502
In the R501 area: Add_Water, Dose_Con, MES_Sync_Request, Mix,
Standard, Temperature, Xfer_inBuf, Xfer_In_Fil, Xfer_In_Pre
M50101, R501_MIX_CFC, R501_MIX_SFC
Data types/phase types, unit classes, units of measure
None (not batch-relevant)
Areas are displayed during recipe creation as a filter criterion for unit
allocation.
Units and possibly equipment phases
Equipment phases
None (not batch-relevant)
Engineering
7.1 Basic engineering for PCS 7
141