Project path
The "Project path" column displays the project path to your S7 program in the SIMATIC
Manager. There you will find all the data blocks that will be downloaded to the AS.
Project
The "Project" column displays the name of your project in the SIMATIC Manager. Here, you
will find the units.
Path
The "Path" column displays the storage path of your project on hard disk.
"Start" button
If you have enabled the selected objects for updating, compiling or downloading the "Start"
button is enabled. If the necessary settings have not been made, the button is grayed out and
cannot be used.
"Close" button
With this button, you close the "Compile/Download" dialog.
"Help" button
With this button, you display the relevant topic in the online help.
Additional information
"CPU" selection (Page 858)
Obtaining the memory configuration and setting the allocation (Page 198)
14.1.12.63

"Connections" tab

What tasks do you perform in the "Connections" tab?
In the "Connections" tab, you compile and download the station and connection configuration
created in HW Config and NetPro. The functions from basic engineering are used.
How are the dialog and its tabs displayed?
You open the "Compile/Download" dialog if you have selected the "Stations" folder or the
"SIMATIC station" folder in the BATCH configuration dialog and then click the "Compile /
Download..." button. Then click on the "Chart folder" tab.
SIMATIC BATCH V8.2