Batch Planning; Flow Chart: How To Create/Edit A Batch - Siemens SIMATIC BATCH Operating Manual

Process control system pcs 7
Table of Contents

Advertisement

9.6

Batch Planning

9.6.1

Flow chart: How to create/edit a batch

Flow chart
What can be planned?
A production order specifies which product will be manufactured. Batches can be assigned to
a the production order manually or automatically.
The recipe on which the batch is based specifies the production process and the duration of
the unit allocation.
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA
BATCH Control Center
9.6 Batch Planning
347

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents