"General" tab (Create order)

In this tab, you can edit the following data for a new order and edit the batches that are created
in it:
● Name: Enter an order name.
● Status:The status display is not currently used.
● Planned quantity: Planned total quantity of the order (order quantity).
● Actual quantity: The actual total quantity of the order (order quantity ) is adapted from the
number of batches and the respective batch quantity.
● Unit of measure:Unit of the product
● Earliest start and latest end of the batches:Earliest start and latest end of the batches (date,
time) of the order (optional)
● BatchesNumber of batches in this order
● Description: An explanatory text can be entered
14.1.9.17

"General" tab (RPH unit class properties)

Function:
A list box with the functions stored in basic engineering is displayed.
Unit class:
The unit class selected in the "Allocations" tab in the RUP is displayed.
Preferred unit:
The preferred unit selected in the "Allocations" tab in the RUP is displayed as the unit class.
Run time:
You can enter a time you have calculated for the processing of this function. The format is
day:hours:minutes:seconds.
Runtime scaling:
Using scaling functions (Page 579), you can influence the quantities used. Depending on the
concrete quantity for the batch, the duration of a step is corrected using the selected scaling
function. As standard, linear and quadratic scaling functions are available:
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA
Context help references
14.1 Dialogs
809