Status And Validity Of Recipes; Status Changes And Validation - Siemens SIMATIC BATCH Operating Manual

Process control system pcs 7
Table of Contents

Advertisement

When you create the recipe structure in the BATCH Recipe Editor you insert the required library
operation using a library reference. The library operation is not copied but a link to the library
operation within the library is created.
Any modifications required must always be made to the library operation stored in the library.
Any changes made to the library operation always affect all links (library references) in the
master recipes of the process cell.
Multiple use
A library operation can be used in the following ways:
● More than once in a process cell
● More than once in a recipe procedure (RP)
● More than once within a recipe unit procedure (RUP) – only with hierarchical recipes
● More than once within a substructure (SUB) – only with flat recipes
See also
Specifying the properties of the library objects (Page 576)
9.5.6

Status and validity of recipes

9.5.6.1

Status changes and validation

Status changes and validation of master recipes and library operations
The initial status of a newly created master recipe or library operation is always "In progress".
You can bring about status changes using the appropriate commands. For batch planning, the
master recipe must be valid.
Status
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA
Triggered by
Meaning
New menu com‐
A master recipe or a library operation always has the
mand
status In progress after it has been created.
Validation
The plausibility (validity) of the parameters in the proc‐
(Page 315) menu
ess cell data is checked.
command
A results list or error list is displayed that indicates, for
example, which parameter settings are missing.
Requirement:
The master recipe or library operation has header pa‐
rameters and a recipe structure.
BATCH Control Center
9.5 Recipes
313

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents