Siemens SIMATIC BATCH Operating Manual page 433

Process control system pcs 7
Table of Contents

Advertisement

Display of the allocation status – hierarchical recipe
Display
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA
Name
Waiting for unit
Unit allocated
ROP running
Waiting for equipment
phase
Equipment phase alloca‐
ted
Allocation error
Missing AS-OS connec‐
tion
BATCH Control Center
Meaning
The control wants to allocate the unit required
by the RUP
Either allocated by another RUP, or there are
not enough memory blocks.
The unit can only be allocated when the
PCS 7 OS server is completely in process
mode.
The control has allocated the unit to the RUP
The control has allocated the ROP
The control wants to allocate the equipment
phase required by the RPH
The control has allocated the RPH
Allocation error or connection failure
OS has no connection to the AS
9.8 Batch control
433

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents