Siemens SIMATIC BATCH Operating Manual page 203

Process control system pcs 7
Table of Contents

Advertisement

"Merge / Compile" tab
Image 7-12
Decide whether or not you want to generate the batch types prior to compilation and whether you want to transfer
the batch messages to the PCS 7 OS. You can do this by selecting or deselecting the relevant check box.
"Download" tab
The dialog is shown below. Components that need to be downloaded are activated
automatically by the system. By selecting the check box in the "Component" table column title,
all configured components are downloaded.
Requirement for downloading the BATCH process cell data
To ensure data consistency, the AS and OS engineering must be completed in the SIMATIC
Manager prior to downloading the BATCH process cell data. The following sequence should
be followed:
1. Compile and download the automation systems
2. Compile and download the PCS 7 OS server
3. Merge/compile and download the BATCH server and BATCH clients
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA
Engineering
7.3 BATCH engineering
203

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents