Engineering
7.1 Basic engineering for PCS 7
7.1.3.2
Procedure for creating the plant hierarchy
Information on creating and setting the plant hierarchy
For detailed information on creating, modifying and setting the properties of the plant hierarchy,
refer to the manual
Only the additional and special settings for the batch configuration are described in the
following.
132
Process Control System PCS 7; Engineering System .
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA