Dock Line Sizing; Securing Lines - Regal 3760 Owner's Manual

Table of Contents

Advertisement

The bow and stern lines should be relatively at a 45 degree
angle with the dock. The stern line can be attached to the
near-shore quarter cleat, but will work more efficiently to
the offshore quarter cleat. The longer line will allow the
boat flow with the tide with less time checking the vessel.

DOCK LINE SIZING

Most dock lines today are made of nylon, either of twisted
rope or braided core and cover. The most often used
material is nylon because of its stretching abilities absorbing
shock loads. It is chafe resistant for extended life and is
easier on bare hands.
The line's size varies with the vessel. Normally, a vessel in
the 20' to 40' boats will use 1/2" diameter nylon lines.
Dock lines need to have the strength to hold the vessel
and have enough density to resist chafing. They shouldn't
be too heavy that they lose their shock-absorbing
capabilities. Use the right size line for the vessel since a
line too large for the boat will pull hard against the vessel
since it won't be forced to stretch. If the line is too small
for the vessel, there is no margin for wear and chafe when
under strain

SECURING LINES

When mooring your boat, make sure the dock lines are
secured at both ends. Depending on your situation you
may need to loop the eye splice of the dock line around a
piling. Sometimes the mooring line will lead down sharply
from the piling to the deck cleat. Loop the eye splice around
the piling twice to keep it from being pulled up off the
pile. Pull the line through the looped eye if the mooring
line is too small to go around the piling twice or too small
to fit over once.
If you must drop a line over a piling that already holds
another boat's line, run the eye of the line up through the
first eye from below, then loop it over the pile. This will
allow either line to be removed without disturbing the
other. If another line is dropped over yours, simply reverse
the process.
Vessel Operation
Secure a little slack in the other dock line, then slip your
eye up through its loop and over the top of the pile. Your
line can be dropped through the other eye.
When debarking from a dock, it is easier to release the
line from a cleat or piling, from on board the boat, as
soon as you leave the dock. Loop a long line around the
cleat or pier and leading both ends on board you can release
the line easily. Slip one end around the cleat or pile, the
pull it back on board. Release the line without the eye
splice, so it will run freely from around the pile without
hanging up on the splice.
7

Advertisement

Table of Contents
loading

Table of Contents