Acd System Restart Processing - NEC Univerge SV8500 Programming Manual

Hide thumbs Also See for Univerge SV8500:
Table of Contents

Advertisement

3. ACD SYSTEM RESTART PROCESSING

When the data link between the Telephony Server and UAP (including MIS) is down in on-line mode, the UAP
must be restarted according to the procedure shown below.
The data for ASYDL SYS1 INDEX864
b4 and b5 is assigned as follows?
bit4=1 (8 ports)
bit5=0 (Clear the SMFN)
YES
Flow of ACD System Restarting
NO
Assign the data as follows:
ASYDL SYS1 INDEX864 Note2
bit4=1 (8 ports)
bit5=0 (Clear the SMFN)
Perform the Power-On initialization.
1.Turn OFF all the power of Telephony Server in
the order of SP --> TP --> PIR0 --> PIR1 --> PIRn.
2. Turn ON the power of Telephony Server in the
order of PIR0 --> PIR1 --> PIRn --> TP --> SP.
Restart the UAP(s) (including MIS).
– 359 –
CHAPTER 7
START
NO
The UAP (including MIS) is connected
with the ACD system?
YES
NO
"Status Monitor Facility Request (SMFR),
FN=126" is used?
YES
NO
You can restart the UAP(s) in the same order
as boot-up (when using more than one UAP)?
YES
Initialize the ACDP independently by using
the ACDIZ command. At this time, select
"Retain" on the Office data parameter. Note 1
Restart each UAP in the same order
as boot-up (when using more than one UAP).
Initialize the ACDP independently by using
the ACDIZ command. At this time, select
"Retain" on the Office data parameter. Note 1
END
SYSTEM OPERATIONS
NO

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv7000

Table of Contents