NEC Univerge SV8500 Programming Manual page 58

Hide thumbs Also See for Univerge SV8500:
Table of Contents

Advertisement

When the system initial (IPL, DM load) is performed, ACD incoming calls terminated before the system
Note 5:
message [6-H] "2033" is output are not distributed to any positions. Therefore, be sure to make the incom-
ing trunk circuit card busy before the system initial (By doing so, the incoming call is in busy tone connec-
tion at the least).
STEP 6: Assign the System data written in NDM.
This data is necessary when using the ACD FCCS services.
ASYDN SYS1
INDEX514- NDM usage
INDEX533- FPC of the node that provides C-VNDM
STEP 7: Assign the basic system data for ACD system, referring to Chapter 4, "2.1 System Data Assignment"
in this manual.
STEP 8: Check the station-to-station connection and confirm no fault status occurs or system messages are
output (such as cable connection fault, LCD display fault, memory alarm fault, abnormal interrupt,
etc.).
STEP 9: Program the ACD office data. Also, program the FCCS data to make ACD service effective through
FCCS network, if necessary. Refer to Chapter 4 "Office Data Design".
STEP 10: Broadcast VNDM data from VNDM Center node to all VNDM Local node in FCCS network, by us-
ing CBCV command. (This is necessary when using the ACD Fusion services.)
STEP 11: Save the DM, ACD data memory into the Flash Card by using MEM_HDD.
– 42 –
CHAPTER 3
INSTALLATION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv7000

Table of Contents