2.4.2 Lifting and securing the frame
Section overview
This section is divided into:
At delivery the IRB 6620LX is divided into two sections. The sections and their
weights are described in
IRB6620LX is therefore divided into sections. The figure below explains the
mounting sequence.
xx0900000334
1
2
3
4
5
6
7
8
Product manual - IRB 6620LX
3HAC035737-001 Revision: P
•
Lifting the frame support on page 60
•
Lifting the frame on page 61
•
Securing the frame support on page 64
•
Securing the frame support (welded) on page 65
Frame configurations on page
Lift the frame supports 1- 4 and place them in an approximate position.
Lift frame 5 and place it on top of frame supports 1 and 2.
Assemble all bolts and nuts 6-7 and tighten them.
Lift frame 8 and place it on top of frame supports 3 and 4.
Assemble all bolts and nuts 9-10 and tighten them.
Join the two tracks 11 and tighten the assembly see section
tracks on page
66. (more then 12m).
Secure the frame supports to the floor 12.
Assemble the robot arm system 13 (axis 2-6).
© Copyright 2009-2018 ABB. All rights reserved.
2 Installation and commissioning
2.4.2 Lifting and securing the frame
56. The assembly of the
Continues on next page
Joining two frame
59