ABB IRB 6620LX Product Manual page 108

Hide thumbs Also See for IRB 6620LX:
Table of Contents

Advertisement

2 Installation and commissioning
2.4.11 Lifting and fitting the cable chain IGUS
Continued
3
4
5
6
Installing the cable chain into the tray
How to install the cable chain into the tray is described in
on page
For more information, see Installation guide - Gliding applications (IGUS) on myABB
business portal (www.myportal.abb.com) or visit the homepage (www.gudel.com).
108
Action
Lift the chain so that it is standing upright and in-
sert a wide lifting sling (50 mm) through the center
of the chain.
Lift the cable chain to the installation position
above the cable tray. The chain should be placed
so that both ends are in the middle of the track,
at the aluminium profile that has a cut-out.
Lower the cable chain into the cable tray. The
ends of the chain should be in the middle of the
track.
In order to keep the correct length for long chains
that are to be rolled, the strapping plate as well
as the first cover and clips are removed. Refit
these parts during installation.
293.
© Copyright 2009-2018 ABB. All rights reserved.
Note
xx1300000889
xx1300000890
Refitting the energy chain
Product manual - IRB 6620LX
3HAC035737-001 Revision: P

Advertisement

Table of Contents
loading

Table of Contents