ABB IRB 6620LX Product Manual page 235

Hide thumbs Also See for IRB 6620LX:
Table of Contents

Advertisement

Required equipment
Equipment, etc.
Gauge
Adjusting tool
Hexagon socket head screw key
Standard tools
Removal
1
2
3
4
5
6
Refitting
1
2
3
4
5
Torque data for roller holder
Roller holder size
BR 40
BR 52
BR 62
BR 72
BR 90
Product manual - IRB 6620LX
3HAC035737-001 Revision: P
Action
Remove the pressure from the supporting roller
using a overhead crane or a fork lift.
Lifting weight more then 600 kg.
WARNING
Do not remove more then one support roller at the
time, or the carriage will bee separated from the
linear guide.
Remove the four screws holding the flange.
Remove the locking screw.
Remove the cover.
Remove the complete roller holder.
Remove the tap screw and tap holding the support
roller.
Action
Fit a new support roller on to the roller holder.
Refit the complete roller holder.
Adjust the support roller using a gauge.
Refit the cover.
Refit the flange using the four screws.
© Copyright 2009-2018 ABB. All rights reserved.
4.5.3 Replacement of support roller in carriage
Spare part no.
Note
Only necessary if the specific
support roller has a supporting
function.
If mounted.
Note
Adjust the roller holder maximal
open and lock it temporary using
the locking screw.
Torque data
87
120
220
220
450
4 Repair
Continued
Note
235

Advertisement

Table of Contents
loading

Table of Contents