Xerox WorkCentre 5790 Series Service Manual page 920

Table of Contents

Advertisement

4.
Install the nudger roll and feed roll assembly,
2
3
Ensure the tang of the
feed roll assembly is
Push the
positioned under the lift
bearing into
arm, then lower the
position and
feed roll assembly into
secure with
position
the KL-clip
Figure 9 Nudger and feed roll install
5.
Fasten the plastic cover into position ensuring that the wiring is not trapped, refer to
ure
5.
Repairs/Adjustments
REP 8.54
Figure
9.
1
Position the roll assembly
above the slots in the frame
and align the dog clutch teeth
4
Push the bearing
into position and
secure with the
KL-clip
6.
Assemble the two halves of the frame,
7.
Align and secure the frame halves,
Fig-
May 2013
4-182
Figure
10.
1
Locate the lower frame in
the rear of the upper frame
2
Locate the lower frame in
the front of the upper frame
Figure 10 Frame assembly
Figure
11.
Xerox® WorkCentre® 5790 Family

Advertisement

Table of Contents
loading

Table of Contents