b.
If possible, the system finishes all jobs.
c.
The delays occur if the machine cancels:
i.
A print job or copy job.
ii.
An exposure lamp calibration.
iii.
An image quality adjustment.
iv.
Diagnostic mode communications.
d.
If a module does not respond and the power down is possible, the power down com-
pletes after a maximum of 2 minutes.
2.
The machine stops processing all jobs that remain in the queue.
3.
A warning message displays on the UI.
Switch Off Failure Procedure
1.
If the machine fails to power down, disconnect the power lead.
2.
If necessary, reconnect the power lead after two minutes.
3.
If the machine does not power down again, perform the
Quick Restart
The quick restart causes the system to reset the software of the single board controller PWB,
the IOT PWB and the GUI.
1.
Press the on/off switch. The Power Down Options window is displayed.
NOTE: The Power Down Confirmation window replaces the Power Down Options window
when the following operations are performed:
a.
The machine is in the diagnostics mode.
b.
During CRU replacement.
c.
The machine is in the Install Wizard or Setup Modes.
d.
A module is not communicating.
e.
The Power Saver mode is disabled.
f.
A software upgrade is performed.
g.
The network controller initializes.
2.
Touch the Quick Restart button on the UI.
3.
When the Quick Restart Confirmation window is displayed, touch the Confirm button.
4.
The Quick Restart window is displayed with the following message: 'Quick Restart is
underway and will take approximately 1 minute'.
Switch On Procedure
1.
After a machine has been switched off, wait a minimum of two minutes before the
machine is switched on.
2.
After a service call, ensure that all service tools are removed from the machine.
3.
Connect the power lead from the power supply outlet to the machine.
4.
Press the on/off switch.
5.
If the machine does not initialize, go to the appropriate RAP as follows:
If the machine switches on, but the UI is blank, go to the
ure RAP.
If the machine does not respond, go to the
If the machine switches on, but does not respond, go to the
RAP.
General Procedures/Information
GP 14
03-374
Power Off Failure RAP.
OF2
UI Touch Screen Fail-
OF5
Dead Machine RAP.
OF5
Boot Up Failure
May 2013
General
1.
When the power lead is connected, the LVPS +3.3VSB supply is energized. The LVPS
+3.3VSB supply provides +3.3VSB to the on/off switch and the IOT PWB.
2.
When the on/off switch is pressed, the LVPS is energized. The +3.3V, +5V, +12V, +24V
and AC voltage for the auxiliary output sockets and fuser module is distributed.
3.
Each module manages its power-on self-test (POST) and power-up sequence.
NOTE: Refer to
GP 22
Electrical Power requirements for further information.
Power Saver Mode
The Power Saver mode is selected from the Power Down window. The Power Saver mode is
delayed until the machine is not active for 30 seconds.
NOTE: If the power saver feature is disabled, the option is not displayed. Refer to
trical Power Requirements for further information.