asieps_tobira.book 223 ページ 2009年10月26日 月曜日 午前9時16分
Diagnostic Procedure with Diagnostic Trouble Code (DTC)
Step
1
CHECK OUTPUT SIGNAL OF ECM.
1) Turn the ignition switch to ON.
2) Measure the voltage between ECM and
chassis ground.
Connector & terminal
(B137) No. 29 (+) — Chassis ground (–):
2
CHECK HARNESS BETWEEN PURGE CON-
TROL SOLENOID VALVE AND ECM CON-
NECTOR.
1) Turn the ignition switch to OFF.
2) Disconnect the connectors from purge con-
trol solenoid valve and ECM.
3) Measure the resistance of harness
between purge control solenoid valve connec-
tor and engine ground.
Connector & terminal
(E4) No. 1 — Engine ground:
3
CHECK HARNESS BETWEEN PURGE CON-
TROL SOLENOID VALVE AND ECM CON-
NECTOR.
Measure the resistance of harness between
ECM and purge control solenoid valve.
Connector & terminal
(B137) No. 29 — (E4) No. 1:
4
CHECK PURGE CONTROL SOLENOID
VALVE.
1) Remove the purge control solenoid valve.
2) Measure the resistance between purge
control solenoid valve terminals.
Terminals
No. 1 — No. 2:
5
CHECK POWER SUPPLY TO PURGE CON-
TROL SOLENOID VALVE.
1) Turn the ignition switch to ON.
2) Measure the voltage between purge control
solenoid valve and engine ground.
Connector & terminal
(E4) No. 2 (+) — Engine ground (–):
6
CHECK POOR CONTACT.
Check poor contact of purge control solenoid
valve connector.
Check
Is the voltage more than 10 V? Even if the mal-
Is the resistance more than 1
MΩ?
Is the resistance less than 1
Ω?
Is the resistance between 10
and 100 Ω?
Is the voltage more than 10 V? Go to step 6.
Is there poor contact of purge
control solenoid valve connec-
tor?
EN(H4SO)(diag)-223
ENGINE (DIAGNOSTICS)
Yes
No
Go to step 2.
function indicator
light illuminates,
the circuit has
returned to a nor-
mal condition at
this time. Contact
your SOA Service
Center.
Go to step 3.
Repair the ground
short circuit of har-
ness between
ECM and purge
control solenoid
valve connector.
Go to step 4.
Repair the open
circuit of harness
between ECM and
purge control sole-
noid valve connec-
tor.
NOTE:
In this case, repair
the following item:
• Open circuit of
harness between
ECM and purge
control
solenoid
valve connector
• Poor contact of
coupling connector
Go to step 5.
Replace the purge
control solenoid
valve. <Ref. to
EC(H4SO)-6,
Purge Control
Solenoid Valve.>
Repair the open
circuit of harness
between main
relay and purge
control solenoid
valve connector.
Repair the poor
Contact the SOA
contact of purge
service center.
control solenoid
valve connector.