Installing A Lan Pass Through Module, Lan Pass Through Module2 - Hitachi CB 520H B1 Service Manual

Compute blade 500 series
Hide thumbs Also See for CB 520H B1:
Table of Contents

Advertisement

3
Turn on LID LED for identifying the target module.
.
See
4
Turn on the maintenance mode from web console.
.
See
5
Power the target switch module off. See
.
page 4-62
6
Remove all cables for the failed module. If SFP+ modules are installed,
.
remove all of the SFP+ modules. See
5-114
7
Release the blue lock tab and then pull the lever, as shown below.
.
8
Holding the switch module, carefully slide out the switch module from the
.
chassis and place it on an anti-static mat.

Installing a LAN pass through module, LAN pass through module2

1
Put on an anti-static wrist strap.
.
2
Reverse the removal procedure to install the switch module.
.
3
Confirm that PWR LED emits in green on the replacing module.
.
When the 10Gb LAN pass through module inserting, the ST1 LED usually
blinks about 30 to 60 seconds during initialization, and then emits in
green.
4
Turn on LID LED for identifying the target module.
.
See
5
Verify that the replacement was successful through the MAR log.
.
See
6
Turn off the maintenance mode from web console.
.
See
7
Turn off LID LED for identifying the target module.
.
See
Identify LED (LID) on/off procedure on page 4-7
Maintenance mode on/off procedure on page 4-10
section.
section.
Figure 5-143 Removing a switch module
Identify LED (LID) on/off procedure on page 4-7
Alert information identification procedure on page 4-5
Maintenance mode on/off procedure on page 4-10
Identify LED (LID) on/off procedure on page 4-7
Replacing parts
Hitachi Compute Blade 500 Series System Service Manual
section.
section.
Power off the switch module on
Removing an SFP+ module on page
section.
section.
section.
section.
5-113

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents