Changing hardware configuration.
1
Remove server blade from chassis. See
.
blade on page
2
Open the top cover. See
.
5-38" section.
3
Remove mezzanine cards from server blade. See
.
card in full-wide server blade on page
4
Install LOM pass through connector. See
.
connector. on page
You need to mount both LOM pass through connector slot #1 and #3 at
the same time.
5
Close the top cover.
.
6
Insert server blade to the chassis. See
.
on page
Diagnosing server blade.
You need to set server blade power value and check blade configuration after
changing LOM configuration. See
Registering LoM license key for CB 520H B2/B3/B4 or CB
520X B1/B2/B3
5-6" section.
5-55" section.
5-7" section.
Change LOM configuration
Hitachi Compute Blade 500 Series System Service Manual
"Removing a full-wide server
"Opening a top cover, Server blade on page
5-51" section.
"Installing a LOM pass through
"Installing a full-wide server blade
"Chapter 8, Diagnosing server
"Replacing a mezzanine
blade".
10-11