Hitachi CB 520H B1 Service Manual page 311

Compute blade 500 series
Hide thumbs Also See for CB 520H B1:
Table of Contents

Advertisement

8
Confirm the slot number and the port number of failed mezzanine card. In
.
addition, record the value of WWN.
Select Emulex nnn line for the failed mezzanine card slot #, where nnn is
even number, in Storage window by using ↓ and ↑ keys, and then press
Enter.
Note: A half wide server blade can install a mezzanine card in slot 2.
A full wide server blade can install two mezzanine cards in slot 2 and slot
4.
9
Repeat from step 4 to step 7 for second port of the failed mezzanine card.
.
10
Power off the server blade.
.
Configuring Emulex mezzanine card
Hitachi Compute Blade 500 Series System Service Manual
7-17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents