Hitachi CB 520H B1 Service Manual page 285

Compute blade 500 series
Hide thumbs Also See for CB 520H B1:
Table of Contents

Advertisement

Figure 6-2 Main window of internal storage monitor
4
Click Maintenance in internal storage monitor window, and then
.
confirm the progress of the rebuilding in Progress column of the middle
Logical Drive (LD) pane and right most Physical Drive (PD) pane.
5
Wait until rebuild progress state becomes 100% or indicates a hyphen.
.
6
Click Dashboard > LD#
.
Confirm whether the rebuilding finished normally.
(Note: * Select the LD number on which the rebuild is executed.)
Identifying RAID rebuild status
Hitachi Compute Blade 500 Series System Service Manual
Figure 6-3 Fault LED
*
] > Logical Drive Information.
6-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents