See
7
Remove all cables for the failed management module.
.
8
Release the blue lock tab and pull the lever, as shown below.
.
9
Holding the management module, carefully slide out the management
.
module from the chassis and place it on an anti-static mat.
Installing a management module
1
Put on an anti-static wrist strap.
.
2
Reverse the removal procedure to install the management module.
.
3
Verify that the Power LED and MSR LED are blinking in green after Power
.
LED blinked in green.
4
Connect the LAN cable to the master management module and start the
.
Web console.
5
Synchronize the internal LAN between the primary management module
.
and the target one.
Select Resources tab on the web console and select Modules > All
Modules > Management Modules.
6
Click Action and select Sync Internal LAN.
.
7
The confirmation dialog box appears. Click OK. Synchronizing internal
.
address will start.
Management module on page 4-61
Figure 5-130 Removing a management module
Replacing parts
Hitachi Compute Blade 500 Series System Service Manual
section.
5-101