Removing A Lom Pass Through Connector; Installing A Lom Pass Through Connector; Replacing A Lom Pass Through Connector In Full-Wide Server Blade - Hitachi CB 520H B1 Service Manual

Compute blade 500 series
Hide thumbs Also See for CB 520H B1:
Table of Contents

Advertisement

Removing a LOM pass through connector.

1
Put on an anti-static wrist strap.
.
2
Little by little and in sequence, loosen the four screws that hold the LOM
.
pass through connector. (Sequence 1 -> 2 -> 3 -> 4 -> 1, and so on)
3
Pull out the LOM pass through connector straight upward, and then
.
remove it.

Installing a LOM pass through connector.

1
Put on an anti-static wrist strap.
.
2
Reverse the removal procedure.
.
Replacing a LOM pass through connector in full-wide server
blade
This procedure describes how to remove a LOM pass through connector from
the server blade.
through connectors.
Do not remove screws except for that hold the LOM pass through
connectors. Work performed by unqualified persons can lead to an electric
shock, fire, or burns. Especially it is hazardous if you touch areas inside
the high-voltage power module.
Note: Use the Phillips screwdriver satisfying the following conditions.
Screw size : 2M
Shaft diameter : 4Φ
Notice:
5-54
Figure 5-69 Removing the LOM pass through connector
Do not remove screws except for that hold the LOM pass
Replacing parts
Hitachi Compute Blade 500 Series System Service Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents