Toyota AVENSIS 2000 Supplement Manual page 676

Hide thumbs Also See for AVENSIS 2000:
Table of Contents

Advertisement

AVENSIS/CORONA SUP (RM781E)
STEERING
POWER STEERING VANE PUMP (1ZZ–FE, 3ZZ–FE)
8.
INSTALL OIL PRESSURE SWITCH
Torque: 21 N·m (210 kgf·cm, 15 ft·lbf)
9.
INSTALL SPRING, FLOW CONTROL VALVE AND
PRESSURE PORT UNION
(a)
Install the spring.
(b)
Install the flow control valve facing in the correct direction
(See page SR–8).
(c)
Coat a new O–ring with power steering fluid, and install
it to the pressure port union.
(d)
Install the pressure port union.
Torque: 69 N·m (700 kgf·cm, 51 ft·lbf)
10.
INSTALL SUCTION PORT UNION
(a)
Coat a new O–ring with power steering fluid, and install
it to the suction port union.
(b)
Install the suction port union with the bolt.
Torque: 12 N·m (120 kgf·cm, 9 ft·lbf)
11.
MEASURE PS VANE PUMP ROTATING TORQUE (See
page SR–11)
SR–17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents