DI–150
INSPECTION PROCEDURE
1
Check battery voltage.
OK:
Voltage: 10 – 14 V
OK
2
Check voltage between terminals IG1 and GND of ABS actuator connector.
ON
ON
ON
ON
IG1
IG1
IG1
IG1
(+)
(+)
(+)
(+)
(–)
(–)
(–)
(–)
OK
AVENSIS/CORONA SUP (RM781E)
DIAGNOSTICS
PREPARATION:
Disconnect ABS actuator connector.
CHECK:
(a)
(b)
OK:
GND
GND
GND
GND
F00067
–
ANTI–LOCK BRAKE SYSTEM WITH ELECTRONIC
BRAKE FORCE DISTRIBUTION (EBD)
NG
Check and replace fuses.
Check and repair the charging system.
Turn the ignition switch ON.
Measure voltage between terminals IG1 and GND of ABS
actuator harness side connector.
Voltage: 10 – 14 V
NG
Check and replace fuses.
Repair or replace harness or connector.