Initiating Frame Relay Backup Switchover/Switchback - Cabletron Systems Netlink FRX4000 User Manual

Frame relay access products
Hide thumbs Also See for Netlink FRX4000:
Table of Contents

Advertisement

Initiating Frame Relay Backup Switchover/Switchback

On-line Operations
Frame relay backup
DLCIs can be configured (as described in
ically become operational a set time after failure of a primary DLCI, and to switch
back to the primary a set time after the primary becomes operational again. These
automatic settings can be overridden via Frame Relay Backup Operations (
from the Main Menu).
From the Frame Relay Backup Operations Menu:
To switch from a primary to one of its backups, press
To switch from a backup to a primary, press
In either case, enter (as prompted) the requested information to identify the primary
and backup.
Chapter
7) to automat-
.
[A]
.
[B]
[B], [J]
18-17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Frx6000Netlink frx6000

Table of Contents