FRX4000 CSU/DSU Tests

Reloading Auxiliary Console Initialization

It should be noted that pinging an FRX interface will verify only connectivity to that
FRX. Using the example in Figure 18-4, if the operator at device A wants to ping
device B, s/he must ping device B's IP address.
To ping Node 1, the operator at device A must ping the IP address of interface 1. To
ping Node B, the operator must ping interface 3. To locate a connectivity problem
between A and B, the operator at device A should first ping interface 1. If a response
is received, the operator at A should then ping interface 3, then (if a response is
received) device B.
A
1
Node 1
To test the CSU/DSU port on an FRX4000, the port must first be disabled. If nec-
essary, press
at the Operations Menu (or
[A]
the port.
To run a CSU/DSU test, press
sponding to the desired test:
=
– transmits a test pattern to the analog portion of the circuitry and
[A]
Self Test
loop the pattern back to itself.
=
[B]
Pattern Generation Test
test pattern to the remote device, which will loop the signals back.
This operation reloads the terminal settings defined for an async terminal connected
to the Console port on an FRX4000 or the COM1 port on an FRX6000.
Press
at the Operations Menu (or
[E]
is connected the Console/COM1 port, the initialization data will be sent.
2
Figure 18-4 Ping Example
[B], [A]
at the Operations Menu, then press the letter corre-
[I]
– transmits a PRBS (pseudo-random bit sequence)
from the Main Menu). If an async terminal
[B], [E]
4
3
Node 2
from the Main Menu) to disable
B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Frx6000Netlink frx6000

Table of Contents