Mazda CX-9 Grand Touring 2009 Manual page 556

Table of Contents

Advertisement

WARNING:
1. Disconnect the negative battery cable.
2. Drain the engine coolant. (See ENGINE COOLANT REPLACEMENT [MZI-3.7] .)
3. Remove the air cleaner and fresh air duct component. (See INTAKE-AIR SYSTEM
REMOVAL/INSTALLATION [MZI-3.7] .)
4. Remove the cooling fan component. (See COOLING FAN COMPONENT
REMOVAL/INSTALLATION [MZI-3.7] .)
5. Remove the front splash shield (RH).
6. Remove the generator and A/C drive belt. (See DRIVE BELT REMOVAL/INSTALLATION [MZI-
3.7] .)
7. Remove in the order indicated in the table.
8. Install in the reverse order of removal.
9. Refill the engine coolant. (See ENGINE COOLANT REPLACEMENT [MZI-3.7] .)
10. Inspect for engine coolant leakage. (See ENGINE COOLANT LEAKAGE INSPECTION [MZI-
3.7] .)
2008 Mazda CX-9 Grand Touring
2008 ENGINE Charging System (MZI-3.7) - Mazda CX-9
Remove and install all parts when the engine is cold, otherwise they
can cause severe burns or serious injury.
When the battery cables are connected, touching the vehicle body
with generator terminal B will generate sparks. This can cause
personal injury, fire, and damage to the electrical components.
Always disconnect the negative battery cable before performing the
following operation.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-9 grand touring 2008

Table of Contents