Mazda CX-9 Grand Touring 2009 Manual page 688

Table of Contents

Advertisement

2. Align the marks and install the inner ring to the shaft.
3. Install a new snap ring.
OUTER RING, CLIP ASSEMBLY NOTE
1. Fill the outer ring and boot (differential side) with the specified grease.
CAUTION:
Grease amount 90-110 g {3.18-3.88 oz}
2. Align the marks, and install the outer ring on to the shaft.
3. Install a new clip to the outer ring clip groove.
4. Install the boot.
Fig. 58: Installing Outer Ring Clip
Courtesy of MAZDA MOTORS CORP.
5. Release any trapped air from the boots by carefully lifting up the small end of each boot with a cloth
wrapped screwdriver.
2008 Mazda CX-9 Grand Touring
2008 DRIVELINE/AXLES Drive Shaft - Mazda CX-9
Fig. 57: Aligning Marks Balls & Cage To Inner Ring
Courtesy of MAZDA MOTORS CORP.
Do not touch grease with your hand. Apply it from the tube to
prevent foreign matter from entering the boot.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-9 grand touring 2008

Table of Contents