Mazda CX-9 Grand Touring 2009 Manual page 663

Table of Contents

Advertisement

3. Remove the tape.
TRIPOD JOINT, SNAP RING ASSEMBLY NOTE
1. Align the marks and install the tripod joint using a bar and a hammer.
2. Install the new snap ring using snap-ring pliers.
CAUTION:
OUTER RING ASSEMBLY NOTE
1. Fill the outer ring and boot (transaxle side) with the specified grease.
CAUTION:
Grease amount 240-260 g {8.48-9.17 oz}
2. Install the roller cassettes.
3. Align the marks, and install the outer ring on to the shaft.
4. Install a new clip.
5. Install the boot.
6. Set the drive shaft to the standard length.
Front drive shaft standard length
LH: 658.7-668.7 mm {25.92-26.30 in}
RH: 630.7-640.7 mm {24.82-25.20 in}
2008 Mazda CX-9 Grand Touring
2008 DRIVELINE/AXLES Drive Shaft - Mazda CX-9
Be sure the snap ring engages correctly in the groove of the
shaft.
Fig. 19: Identifying Mark Location
Courtesy of MAZDA MOTORS CORP.
Do not touch grease with your hand. Apply it from the tube to
prevent foreign matter from entering the boot.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-9 grand touring 2008

Table of Contents