ABB RELION Series Technical Manual page 528

Grid automation
Hide thumbs Also See for RELION Series:
Table of Contents

Advertisement

Section 6
Supervision functions
522
change and a false fuse failure can occur. To prevent this, the minimum phase current
criterion is checked.
The fuse failure detection is active until the voltages return above the Min Op voltage
delta setting. If a voltage in a phase is below the Min Op voltage delta setting, a new
fuse failure detection for that phase is not possible until the voltage returns above the
setting value.
Decision logic
If voltages are Wye-connected, it is recommended to scale the default
values of voltage-based settings with 1/sqrt(3) because the default
setting values apply for Delta-connected settings.
The fuse failure detection outputs FUSEF_U and FUSEF_3PH are controlled
according to the detection criteria or external signals.
Table 536:
Fuse failure output control
Fuse failure detection criterion
Negative-sequence criterion
Table continues on next page
Conditions and function response
If a fuse failure is detected based on the negative
sequence criterion, the FUSEF_U output is
activated.
If the fuse failure detection is active for more than
five seconds and at the same time all the phase
voltage values are below the set value of the
in voltage setting with Enable seal in turned to
"True", the function activates the FUSE_3PH
output signal.
The FUSEF_U output signal is also activated if all
the phase voltages are above the
setting for more than 60 seconds and at the same
time the negative sequence voltage is above
Seq voltage Lev for more than 5 seconds, all the
phase currents are below the
setting and the circuit breaker is closed, that
is,CB_CLOSED is TRUE.
REC615 and RER615
1MRS758755 A
Seal
Seal in voltage
Neg
Current dead Lin Val
Technical Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rer615Rec615

Table of Contents