Manuals and User Guides for ABB RELION 650 Bay Control System. We have
1
ABB RELION 650 Bay Control System manual available for free PDF download: Commissioning Manual
ABB RELION 650 Commissioning Manual (114 pages)
Busbar protection
Brand:
ABB
| Category:
Industrial Equipment
| Size: 2 MB
Table of Contents
Table of Contents
7
Introduction
13
This Manual
13
Intended Audience
13
Product Documentation
14
Product Documentation Set
14
Document Revision History
15
Related Documents
15
Document Symbols and Conventions
16
Symbols
16
Document Conventions
17
IEC 61850 Edition 1 / Edition 2 Mapping
17
Safety Information
21
Symbols on the Product
21
Warnings
21
Caution Signs
22
Note Signs
23
Available Functions
25
Main Protection Functions
25
Back-Up Protection Functions
25
Control and Monitoring Functions
26
Communication
29
Basic IED Functions
30
Starting up
33
Factory and Site Acceptance Testing
33
Commissioning Checklist
33
Checking the Power Supply
33
Energizing the IED
34
Checking the IED Operation
34
IED Start-Up Sequence
34
Setting up Communication between PCM600 and the IED
35
Writing an Application Configuration to the IED
39
Checking CT Circuits
39
Checking VT Circuits
40
Using the RTXP Test Switch
40
Checking the Binary Input/Output Circuits
41
Binary Input Circuits
41
Binary Output Circuits
41
Checking Optical Connections
41
Configuring the IED and Changing Settings
43
Overview
43
Configuring Analog CT Inputs
43
Supervision of Input/Output Modules
44
Establishing Connection and Verifying the SPA/IEC Communication
45
Entering Settings
45
Entering SPA Settings
45
Entering IEC Settings
45
Verifying the Communication
45
Verifying SPA Communication
46
Verifying IEC Communication
46
Fiber Optic Loop
46
Optical Budget Calculation for Serial Communication with SPA/IEC
47
Establishing Connection and Verifying the LON Communication
49
Communication Via the Rear Ports
49
LON Communication
49
The LON Protocol
50
Hardware and Software Modules
50
Optical Budget Calculation for Serial Communication with LON
51
Testing IED Operation
53
Preparing for Test
53
Requirements
53
Preparing the IED to Verify Settings
54
Activating the Test Mode
55
Preparing the Connection to the Test Equipment
55
Connecting the Test Equipment to the IED
56
Releasing the Function to be Tested
56
Verifying Analog Primary and Secondary Measurement
57
Testing the Protection Functionality
57
Forcing of Binary Input/Output Signals for Testing
58
Forcing Concept
58
How to Enable Forcing
58
Enable Forcing by Using LHMI
58
Enable Forcing Using TESTMODE Function Block
58
How to Change Binary Input/Output Signals Using Forcing
59
Forcing by Using LHMI
59
Forcing by Using PCM600
60
How to Undo Forcing Changes and Return the IED to Normal Operation
62
Undo Forcing by Using TESTMODE Component
62
Undo Forcing by Using LHMI
62
Undo Forcing by Using PCM600
62
Testing Functionality by Secondary Injection
63
Testing Disturbance Report
63
Introduction
63
Disturbance Report Settings
63
Disturbance Recorder (DR)
63
Event Recorder (ER) and Event List (EL)
64
Identifying the Function to Test in the Technical Reference Manual
64
Differential Protection
64
High Impedance Differential Protection HZPDIF
64
Verifying the Settings
64
Completing the Test
65
Current Protection
65
Directional Phase Overcurrent Protection, Four Steps OC4PTOC
65
Function Revision History
65
Verifying the Settings
66
Completing the Test
67
Four Step Residual Overcurrent Protection, (Zero Sequence or Negative Sequence Directionality) EF4PTOC
67
Function Revision History
67
Four Step Directional Earth Fault Protection
67
Four Step Non-Directional Earth Fault Protection
68
Completing the Test
68
Four Step Negative Sequence Overcurrent Protection NS4PTOC
68
Function Revision History
68
Completing the Test
69
Thermal Overload Protection, Two Time Constants TRPTTR
69
Checking Operate and Reset Values
69
Completing the Test
70
Breaker Failure Protection, Phase Segregated Activation and Output CCRBRF
70
Function Revision History
70
Checking the Phase Current Operate Value, IP
70
Checking the Residual (Earth Fault) Current Operate Value IN> Set below IP
71
Checking the Re-Trip and Back-Up Times
71
Verifying the Re-Trip Mode
71
Verifying the Back-Up Trip Mode
72
Verifying Instantaneous Back-Up Trip at CB Faulty Condition
72
Verifying the Case Retripmode = Contact
73
Verifying the Function Mode Current/Contact
73
Completing the Test
74
Pole Discordance Protection CCPDSC
74
Verifying the Settings
74
Voltage Protection
75
Two Step Undervoltage Protection UV2PTUV
75
Verifying the Settings
75
Completing the Test
76
Two Step Overvoltage Protection OV2PTOV
76
Verifying the Settings
76
Extended Testing
76
Completing the Test
77
Two Step Residual Overvoltage Protection ROV2PTOV
77
Function Revision History
77
Verifying the Settings
77
Secondary System Supervision
78
Fuse Failure Supervision FUFSPVC
78
Checking that the Binary Inputs and Outputs Operate as Expected
78
Measuring the Operate Value for the Negative Sequence Function
78
Measuring the Operate Value for the Zero-Sequence Function
79
Measuring the Operate Value for the Dead Line Detection Function
80
Checking the Operation of the Du/Dt and DI/Dt Based Function
80
Completing the Test
81
Control
81
Single Command, 16 Signals SINGLECMD
81
Logic
81
Tripping Logic, Common 3-Phase Output SMPPTRC
81
Function Revision History
81
Phase Operating Mode
81
1Ph/3Ph Operating Mode
82
1Ph/2Ph/3Ph Operating Mode
82
Circuit Breaker Lockout
83
Completing the Test
84
Monitoring
84
Gas Medium Supervision SSIMG
84
Function Revision History
84
Conditions
84
Testing the Gas Medium Supervision for Temperature Alarm and Temperature Lockout Conditions
85
Completing the Test
85
Liquid Medium Supervision SSIML
85
Function Revision History
85
Testing the Liquid Medium Supervision for Level Alarm and Level Lockout Conditions
86
Testing the Gas Medium Supervision for Temperature Alarm and Temperature Lockout Conditions
86
Completing the Test
86
Breaker Monitoring SSCBR
86
Verifying the Settings
87
Completing the Test
88
Event Function EVENT
88
Limit Counter L4UFCNT
88
Function Revision History
89
Voltage Harmonic Monitoring VHMMHAI
89
Verifying the Signals and Settings
89
Completing the Test
89
Metering
89
Pulse-Counter Logic PCFCNT
89
Function for Energy Calculation and Demand Handling ETPMMTR
90
Verifying the Settings
90
Completing the Test
91
Station Communication
91
Multiple Command and Transmit MULTICMDRCV / MULTICMDSND
91
Basic IED Functions
91
Parameter Setting Group Handling SETGRPS
91
Verifying the Settings
91
Completing the Test
92
Exit Test Mode
92
Commissioning and Maintenance of the Fault Clearing System
93
Commissioning Tests
93
Periodic Maintenance Tests
93
Visual Inspection
94
Maintenance Tests
94
Preparation
94
Recording
94
Secondary Injection
94
Alarm Test
94
Self Supervision Check
95
Trip Circuit Check
95
Measurement of Service Currents
95
Restoring
96
Troubleshooting
97
Checking the Self Supervision Signals
97
Checking the Self Supervision Function
97
Determine the Cause of an Internal Failure
97
Self Supervision HMI Data
97
General IED Status
97
Fault Tracing
98
Internal Fault Indications
98
Using Front-Connected PC
99
Diagnosing the IED Status Via the LHMI Hint Menu
100
Hardware Re-Configuration
102
Repair Instruction
103
Repair Support
104
Maintenance
104
Glossary
105
Advertisement
Advertisement
Related Products
ABB RELION REC650
ABB Relion 630 Series
ABB RELION Series
ABB Relion SAM600
ABB Relion REM615
ABB RELION GRID AUTOMATION REC615
ABB REC 523
ABB RER103-MB
ABB RET650 A05A 3W/1CB
ABB RELION 650 SERIES
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL