Port commissioning
Recommissioning all ports on a blade
NOTE
All ports on the blade must be managed by the Management application.
Select a port on the blade for which you want to recommission all ports, and then select Configure
> Port Commissioning > Recommission > All Ports on the Blade.
NOTE
You can only recommission ports from the logical switch, not the physical chassis.
While recommissioning is in progress, an up arrow icon displays next to the port icon in the Product
List. You can view the port commissioning results in the deployment reports (refer to
port commissioning deployment report"
When the recommission is complete, an application event displays in the Master Log detailing
success or failure.

Port commissioning deployment results

FIGURE 216
The Deployment Results contains the following data:
538
Port commissioning deployment results
Date and Time — The date and time of the deployment.
Export — Select to export the results to CSV or HTML (refer to
a file"
on page 540).
Email — Select to e-mail the results (refer to
on page 539).
"Exporting and saving a report to
"E-mailing a report"
Brocade Network Advisor SAN User Manual
"Viewing a
on page 540).