Figure 7-216 New Server Cluster Wizard — Cluster name and domain
5. Enter the host name of the first cluster node. Under Advanced can be a
minimal test chosen. This helps to install the cluster when some tests fail and
the cluster setup means that this is critical and the setup is stopped.
Figure 7-217 New Server Cluster Wizard — Select node
6. The cluster setup performs some test to verify that the hardware and software
setup is able to operate a cluster. The warnings in this screen indicating that
drives C: and E: are not manageable by the cluster service. This is correct,
362
IBM TotalStorage DS300 and DS400 Best Practices Guide