Call Processing Event Synchronization; Description - Agilent Technologies 8960 Series Reference Manual

Hide thumbs Also See for 8960 Series:
Table of Contents

Advertisement

Call Processing Event Synchronization

Description

Using the call processing subsystem overlapped command synchronization commands, you can query the test
set to find out when an overlapped command operation is done (:DONE?, :OPC?), force the test set to not
execute any more commands until an overlapped command operation has completed (:WAIT), or simply force
an overlapped command to behave as a sequential command (:SEQ).
Pending Operation Flags
Associated with each overlapped command, the test set maintains a binary indicator known as a pending
operation flag. A pending operation flag is set true when the operation started by the overlapped command is
executing, and is set false when the operation is no longer executing.
In addition to the call processing subsystem overlapped commands, the test set also provides the
NOTE
measurement-related INITiate <measurement> overlapped commands.
S:\Hp8960\E1963A WCDMA\3.2 release\Reference Guide\Chapters\wcdma_prog_sync_callpro.fm
Call Processing Event Synchronization
445

Advertisement

Table of Contents
loading

Table of Contents