Issue 1.0
5 - 66
1.
Position the CHS BASE UNIT on desired surface and mark four
holes to be drilled (refer to
2.
Drill the four holes required for floor installation.
3.
Using four screws, secure the CHS BASE UNIT to the floor
(refer to
Figure 5-88 Secure CHS BASE UNIT with Screws
screw location).
Figure 5-88 Secure CHS BASE UNIT with Screws
4.
Position the CHS LARGE BATT BOX on top of the CHS BASE
UNIT.
UNIVERGE SV8100/SV8300
Figure 5-87 CHS BASE
Figure 5-87 CHS BASE UNIT
Installing the SV8300 Chassis
UNIT).
for