NEC Univerge SV8100 System Hardware Manual page 275

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

UNIVERGE SV8100/SV8300
System Hardware Manual
3.5.5.3
Install the PZ-BS11 Expansion Blade in the CHS2U-US
Expansion Chassis
For the Expansion Chassis to function, the PZ-BS10 blade must
be installed in Controlling Chassis.
Do not remove or install this blade with
the power on.
1. Ensure the chassis is powered down.
2. Locate the door positioned on the left end (expansion
bay) of the Expansion Chassis.
Figure 5-47
3. From the left side of the chassis, pull cover outward to
expose the expansion bay.
Expansion Bay
PZ-BS11 Expansion Bay in Expansion
Chassis
Issue 1.0
5 - 41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv8300

Table of Contents