Figure 5-97 Install Chs Large Batt Box Front Cover; Figure 5-98 Cable Connection Between Chassis And Chs Large Batt Box - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

UNIVERGE SV8100/SV8300
System Hardware Manual
16.
Install the front cover (refer to
BATT BOX Front

Figure 5-97 Install CHS LARGE BATT BOX Front Cover

17.
Connect the IP3-L BATT BOX CABLE between the terminal
unit in the CHS LARGE BATT BOX and battery connector of
the chassis through holes (refer to
Connection between Chassis and CHS LARGE BATT BOX (45
Minutes Battery
When providing 45 minutes backup time:
Hole
Figure 5-98
Cable Connection between Chassis and CHS LARGE
BATT BOX (45 Minutes Battery Backup)
Figure 5-97 Install CHS LARGE
Cover).
Figure 5-98 Cable
Backup)).
Issue 1.0
Expansion Chassis
Expansion Chassis
Expansion Chassis
Controlling Chassis
CHS LARGE BATT
BOX
5 - 71

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv8300

Table of Contents