Table 6-36 Cd-4Cotb Maximum Upgrade Capacities - NEC Univerge SV8100 System Hardware Manual

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

UNIVERGE SV8100/SV8300
System Hardware Manual
One trunk status LED
One Blade status LED
Four Caller ID Circuits
Two Power Failure Transfer Circuits
Connection for COIDB Daughter Board
The 4COIU blade consumes four trunk ports ranging between ports
001~200. The CN2 connector provides connection to four analog
trunk ports, which are polarity sensitive (tip-to-tip, ring-to-ring).
The power failure circuits (CN3), however, are not polarity sensitive.
When using the CD-4COTB blade for ground
start trunks, the PBX ground must be
connected as described in
the SV8100 Chassis
Chassis Grounding on page 4-39
will not function correctly.
The trunk ports are polarity sensitive. Be
careful when wiring the trunks.
When connecting the RJ-61 cables to the
CD-4COTB blades, note the position of the
Power Failure connector (CN3). Do not
confuse this connector as the trunk connector
(CN2).
Switching from Loop Start to Ground Start is
set in system programming.
Do not wire an RJ-11 directly to the
CD-4COTB interface. Use the appropriate
RJ-61 wiring when connecting to the
CD-4COTB.

Table 6-36 CD-4COTB Maximum Upgrade Capacities

maximum capacities for the 4COIU blades when they are upgraded.
Table 6-36 CD-4COTB Maximum Upgrade Capacities
19" Chassis
19" Chassis
with CPU
without CPU
5
,
section 3.5.5 Install 19"
19" Chassis
x4
6
23
Issue 1.0
Chapter 4 Installing
or the trunks
provides the
Networked
Chassis
25
6 - 71

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv8300

Table of Contents