Verifying the Alarm Relay Output Connections to the SCM

This procedure details the test steps which must be performed to verify that the OPTI-6100
chassis external alarm relay outputs are properly connected to any office alarm equipment.

Prerequisite Procedures

Complete the following procedure prior to verifying the alarm relay output connections. If
necessary, refer to the appropriate documentation. The prerequisite procedure is as follows:
OPTI-6100 Installation and Turn-Up Practice (P/N 61184500L1-5)

Tools and Materials Required

VT100 Terminal or PC with VT100 Terminal Emulation software
Procedure
1. Connect the OPTI-6100 Craft interface.
Connect to the chassis craft interface with either a VT100 compatible terminal or with a PC
running VT100 emulation software, using the procedure in 61184500L1-5. If the chassis is
part of a management cluster connected to the local network, a PC connected to the
network can be used to Telnet into the chassis.
2. Login to the OPTI-6100 System.
3. From the OPTI-6100 Main menu, select
4. From the System Controller menu, select
5. From the Test menu, select
6. Configure the Alarm Relay Concentrator for
If the chassis is connected to an Alarm Relay Concentrator which is connected to an
upstream alarm system, configure the Concentrator in Out of Service or Test mode for the
OPTI-6100 input positions so that no alarms are forwarded. (Refer to the Alarm Relay
Concentrator documentation.)
7. Check the Critical Audible Relay:
a. Toggle the
Critical Audible Relay
b. Verify that the Alarm Relay Concentrator indicates a critical audible alarm for the proper
chassis1 location.
c. Toggle the Critical Audible Relay off.
d. Verify that the alarm indication clears on the Concentrator.
8. Check the Critical Visual Relay.
a. Toggle the
Critical Visual Relay
b. Verify that the Alarm Relay Concentrator indicates a critical visual alarm for the proper
chassis location.
c. Toggle the Critical Visual Relay off.
d. Verify that the alarm indication clears on the Concentrator.
61184500L1-5L
Appendix A, Acceptance Test Procedure - Follow-Up Procedures
System Controller
, and press
Test
, and press
Test Alarm Relays
Out of Service
on.
on.
, and press
.
E
NTER
.
E
NTER
.
E
NTER
or
.
Test
A-9