PWE3M Provisioning
Use this Provisioning procedure to provision the PWE3M module (P/N 1184535L2).
To provision the PWE3M module, complete the following steps:
1. From the OPTI-6100 Main menu, select
2. From the MS Modules menu, select the PWE3M module to provision, and press
3. From the PWE3M Line Card menu, select
4. From the Provisioning menu, select
5. From the Equipment Provisioned State menu, select
6. From the Provisioning menu, select
7. From the Facility Provisioned State menu, select
8. From the Provisioning menu, select
NOTE
AINS prevents alarms from being reported on facilities that are not
yet receiving a valid signal. Refer to
9. From the AINS Timer menu, select
10. From the Provisioning menu, select
11. On the AINS Time screen, enter the number of hours and minutes, and press
Table 157
lists the minimum factory defaults and values that are loaded after installation and
self-test for the PWE3M module.
Provisioning Options
Equipment Provisioned State
Facility Provisioned State
AINS Time
AINS Timer
Refer to
"Appendix C, Advanced Ethernet Provisioning"
provisioning options.
61184500L1-5L
Equipment Provisioned State
Facility Provisioned State
AINS Timer
Enable
AINS Time
Table 157. PWE3M Provisioning Options
Settings
IS
♦
♦
OOS-MA
♦
OOS-MA UAS (default)
♦
IS
OOS-MA
♦
♦
OOS-MA UAS (default)
1 Minute to 96 Hours; 4:00 is the default
♦
Enabled
Disabled (default)
♦
Tributary Module Installation and Turn-Up
, and press
MS Modules
, and press
Provisioning
, and press
and press
IS,
, and press
and press
IS,
, and press
E
NTER
"Auto In-Service"
, and press
.
E
NTER
, and press
E
NTER
for more details on various Ethernet
.
E
NTER
E
NTER
.
E
NTER
.
E
NTER
.
E
NTER
.
E
NTER
to place the facility IS.
E
NTER
.
on page 332.
.
E
NTER
.
.
313