Fiber Connection And Routing; Module Insertion; Figure 140. Omm12 Module Insertion Diagram - ADTRAN OPTI-6100 Installation Manual

Installation and turn-up practice
Hide thumbs Also See for OPTI-6100:
Table of Contents

Advertisement

OPTI-6100 Installation and Turn-Up Practice
Use this Installation and Turn-Up procedure for the following modules:
OMM12LR (P/N 1184504L1)
OMM12VLR (P/N 1184504L2)
OMM12VIR (P/N 1184502L3)
OMM12IR (P/N 1184502L4)

Fiber Connection and Routing

Identify the fiber conductors to be terminated on the OMM module, and insert the connectors
into the
or
jacks as appropriate. See
IN
OUT

Module Insertion

NOTE
If present, remove the HS Module Blank (P/N 1184506L1) from the
appropriate slot of the OPTI-6100 chassis.
Install the OMM module according to
NOTE
Route the fiber conductors along the chassis fiber tray.
230
Figure
1. Open latch

Figure 140. OMM12 Module Insertion Diagram

OMM12VLR2 (P/N 1184502L5)
OMM12VIRE (P/N 1184504L6)
OMM12VLRE (P/N 1184502L7)
OMM12VLR2E (P/N 1184502L8)
Figure 139
on page 229 (left) for fiber routing.
140.
3. Close latch
2. Align module with
guide groove;
push firmly until
seated
61184500L1-5L

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents