Tributary Module Installation And Turn-Up - ADTRAN OPTI-6100 Installation Manual

Installation and turn-up practice
Hide thumbs Also See for OPTI-6100:
Table of Contents

Advertisement

TRIBUTARY MODULE INSTALLATION AND TURN-UP

This section details the installation and basic provisioning of the tributary modules.
The installation and provisioning procedures in this section are as follows:
"DS1 Module Installation"
"DS1 Module Provisioning"
"DS3/EC1 Module Installation"
"DS3/EC1 Module Provisioning"
"Ethernet Module Installation"
"Ethernet Module Provisioning"
"Gigabit Ethernet Module Installation"
"Gigabit Ethernet Module Provisioning"
"Transmux Module Installation"
"Transmux Module Provisioning"
"OC-3/OC-12 Tributary Module Installation"
"OC-3 Tributary Module Provisioning"
"OC-12 Tributary Module Provisioning"
Other topics in this section include:
"Auto In-Service"
"Auto Frame Format Detection"
"DCC Provisioning on Tributary Modules"
"Blank Panel Installation"
NOTICE
Electrostatic discharge (ESD) can damage electronic modules.
Before handling modules, wear an antistatic discharge wrist strap
to prevent damage to electronic components. Place modules in
antistatic packing material when transporting or storing. When
working on modules, always place them on an approved antistatic
mat that is electrically grounded.
Inspect all modules prior to installation. If a module has been
damaged during shipping, file a claim with the carrier and contact
ADTRAN Customer Support. Refer to
61184500L1-5L
on page 254
on page 256
on page 276
on page 278
on page 287
on page 292
on page 318
on page 320
on page 332
on page 333
on page 336
on page 303
on page 309
on page 324
on page 328
on page 330
on page 334
"Appendix D,
Tributary Module Installation and Turn-Up
Warranty".
253

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents