ADTRAN OPTI-6100 Installation Manual page 382

Installation and turn-up practice
Hide thumbs Also See for OPTI-6100:
Table of Contents

Advertisement

OPTI-6100 Installation and Turn-Up Practice
19. Press
three times to return to the OPTI-6100 Main menu.
E
SC
20. From the Main menu, select
21. From the MS Modules menu, select a tributary module to be configured, and press
22. From the Line card menu, select
23. From the Provisioning menu, select
24. From the Equipment Provisioned State menu, select
25. From the Provisioning menu, select
26. From the Facility Provisioned State menu, select
press
.
E
NTER
27. From the Provisioning menu, select
28. From the Line Build Out menu, select the line length for the facility, and press
29. Press
to return to the Line card menu.
E
SC
30. From the Line card menu, select
31. From the Test menu, select
32. From the Loopback menu, select
33. Verify on the DS3 test set that the test pattern was returned as sent.
34. From the Test menu, select
35. From the Loopback menu, select
36. Press
twice to return to the Line card menu.
E
SC
A-6
, and press
MS Modules
, and press
Provisioning
Equipment Provisioned State
Facility Provisioning
, and press
Line Build Out
, and press
Test
, and press
Loopback
E
, and press
Line Loop
, and press
Loopback
E
, and press
No Loop
.
E
NTER
.
E
NTER
, and press
, and press
IS (In Service)
, and press
E
NTER
OOS-MA (Out of Service, Maintenance)
.
E
NTER
.
E
NTER
.
NTER
.
E
NTER
.
NTER
.
E
NTER
.
E
NTER
.
E
NTER
.
E
NTER
.
, and
.
E
NTER
61184500L1-5L

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents